Sewage Treatment Plant (1st Module) at Bandar Rimbayu Mixed Development, Kuala Langat
Sewage Treatment Plant (1st Module) at Bandar Rimbayu is designed for the capacity of 25,700 PE (Ultimate PE is 110,000 PE) using Sequencing Batch Reactor (SBR), treating the sewage generated from Bandar Rimbayu.